Projects, Wastewater treatment Thermal Power WASTEWATER TREATMENT FOR MONG DUONG THERMAL POWER Capacity: 12.624 m3/dayLocation: Mong Duong district, Quang Ninh provinceClient: AES – USA typical image Construction, paint, plastic Oil & Gas wastewater