![](https://eratech.com.vn/wp-content/uploads/2021/12/Rangdong.jpg)
PUMP STATION HOA PHU HOA THANG
Capacity: 62.000 m3/day
Location: Bac Binh District, Binh Thuan Province
Client: Rang Dong Joint Stock Company
![](https://eratech.com.vn/wp-content/uploads/2021/12/boovsgbt.jpg)
PUMPING STATION OF WATER TREATMENT PLANT OF BOO VSG BINH THUAN
Capacity: 24.000 m3/day
Location: Lagi town, Binh Thuan province
Client: V.S.G Real Estate Corporation
![](https://eratech.com.vn/wp-content/uploads/2021/12/hamluong.jpg)
PUMPING STATION FOR HAM LUONG BRIDGE
Capacity: 7.000 m3/day
Location: Mo Cay South & Mo Cay North dist, Ben Tre province
Client: Haskoning-DHV Vietnam – Netherlands
typical image
![](https://eratech.com.vn/wp-content/uploads/2021/12/trambom3.jpg)
![](https://eratech.com.vn/wp-content/uploads/2021/12/trambom1.jpg)
![](https://eratech.com.vn/wp-content/uploads/2021/11/Anhiep.jpg)
![](https://eratech.com.vn/wp-content/uploads/2021/12/anhiep1.jpg)